no code implementations • 8 Nov 2021 • David J. Biagioni, Xiangyu Zhang, Peter Graf, Devon Sigler, Wesley Jones
We demonstrate that optimal control for this problem is challenging, requiring more than 8-hour lookahead for MPC with perfect forecasting to attain the minimum cost.