A Fixed-Flexible BESS Allocation Scheme for Transmission Networks Considering Uncertainties

18 May 2019  ·  Malhar Padhee, Anamitra Pal, Chetan Mishra, Katelynn A. Vance ·

Battery energy storage systems (BESSs) can play a key role in mitigating the intermittency and uncertainty associated with adding large amounts of renewable energy to the bulk power system (BPS). Two BESS technologies that have gained prominence in this regard are Lithium-ion (LI) BESS and Vanadium redox flow (VRF) BESS. This paper proposes a fixed-flexible BESS allocation scheme that exploits the complementary characteristics of LI and VRF BESSs to attain optimal techno-economic benefits in a wind-integrated BPS. Studies carried out on relatively large transmission networks demonstrate that benefits such as reduction in system operation cost, wind spillage, voltage fluctuations, and discounted payback period, can be realized by using the proposed scheme.

PDF Abstract
No code implementations yet. Submit your code now

Tasks


Datasets


  Add Datasets introduced or used in this paper

Results from the Paper


  Submit results from this paper to get state-of-the-art GitHub badges and help the community compare results to other papers.

Methods


No methods listed for this paper. Add relevant methods here