A Hybrid Intelligent Model for Software Cost Estimation

1 Dec 2015  ·  Wei Lin Du, Luiz Fernando Capretz, Ali Bou Nassif, Danny Ho ·

Accurate software development effort estimation is critical to the success of software projects. Although many techniques and algorithmic models have been developed and implemented by practitioners, accurate software development effort prediction is still a challenging endeavor in the field of software engineering, especially in handling uncertain and imprecise inputs and collinear characteristics. In this paper, a hybrid in-telligent model combining a neural network model integrated with fuzzy model (neuro-fuzzy model) has been used to improve the accuracy of estimating software cost. The performance of the proposed model is assessed by designing and conducting evaluation with published project and industrial data. Results have shown that the proposed model demonstrates the ability of improving the estimation accuracy by 18% based on the Mean Magnitude of Relative Error (MMRE) criterion.

PDF Abstract
No code implementations yet. Submit your code now

Tasks


Datasets


  Add Datasets introduced or used in this paper

Results from the Paper


  Submit results from this paper to get state-of-the-art GitHub badges and help the community compare results to other papers.

Methods


No methods listed for this paper. Add relevant methods here