The Effects of Correctly Modeling Generator Step-Up Transformer Status in Geomagnetic Disturbance Studies

23 Aug 2022  ·  Jessica L. Wert, Pooria Dehghanian, Jonathan Snodgrass, Thomas J. Overbye ·

In order to correctly model the impacts of geomagnetically induced current (GIC) flows, the generator step-up (GSU) transformer status must be properly modeled. In power flow studies, generators are typically removed from service without disconnecting their GSU transformers since the GSU transformer status has little to no impact on the power flow result. In reality, removing a generator from service involves also removing its GSU transformer from service. This difference presents a discrepancy between simulated behavior and system observations during geomagnetic disturbance (GMD) events. This paper presents GMD case studies on 2000-bus and 24,000-bus systems in which reactive power losses and geomagnetically induced currents are compared across scenarios in which the GSU transformers for the disconnected generators are either in-service or out-of-service. The results demonstrate a 3.2 to 15.5 percent error in reactive power losses when the GSU status is modeled incorrectly. Discrepancies of up to 95 A per phase for branch GIC flows and 450 A for transformer neutral GIC flows are also observed and visualized.

PDF Abstract
No code implementations yet. Submit your code now

Tasks


Datasets


  Add Datasets introduced or used in this paper

Results from the Paper


  Submit results from this paper to get state-of-the-art GitHub badges and help the community compare results to other papers.

Methods