no code implementations • 9 Mar 2022 • Patrick Maloney, Xiaoyuan Fan, Marcelo Elizondo, Xue Li
This work proposes a methodology for estimating recovery times for transmission lines and substations, and is demonstrated on a real-world 1269-bus power system model of Puerto Rico under 20 hurricane scenarios, or stochastic realizations of asset failure under the meteorological conditions of Hurricane Maria.