1 code implementation • 12 Dec 2022 • Patrick de Mars
When generator outages are considered, guided tree search saves over 2\% in operating costs as compared with methods using conventional $N-x$ reserve criteria.
no code implementations • 9 Dec 2022 • Cormac O'Malley, Patrick de Mars, Luis Badesa, Goran Strbac
We find that deterministic and stochastic MIP consistently produce lower-cost UC schedules than RL, exhibiting better reliability and scalability with problem size.
no code implementations • 16 Mar 2020 • Adrian Kelly, Aidan O'Sullivan, Patrick de Mars, Antoine Marot
This paper presents the background material required for the Learning to Run Power Networks Challenge.